Legrand EFBFF User Manual

Browse online or download User Manual for Hardware Legrand EFBFF. Legrand EFBFF User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Evolution Series
Furniture Feed Floor Box
I N S T A L L A T I O N I N S T R U C T I O N S
Installation Instruction No.: 1 009 727R1 Updated October 2011
Legrand/Wiremold electrical systems conform to and should be properly
grounded in compliance with requirements of the current National
Electrical Code or codes administered by local authorities.
All electrical products may present a possible shock or fire
hazard if improperly installed or used. Legrand/Wiremold electrical
products may bear the mark of a Nationally Recognized Testing
Laboratory (NRTL) and should be installed in conformance with current
local and/or the National Electrical Code.
IMPORTANT: Please read all instructions
before beginning.
PRODUCTS COVERED: EFBFF, EFBFF-OG
CAUTION: Box is intended for use on carpet, tile or wood covered concrete floors.
Not designed for use on bare concrete or terrazzo floors
1. Position box in accordance with job site floor plan and/or
engineering blue print. Use the dimensions give in the
following table as a reference for positioning.
2. remove protective cover (Mudcap) from box.
3. Attach leveling skis to bottom of box using the nuts in
the included sub-pack.
CONCRETE POUR INSTALLATION (EFBFF, EFBFF-OG):
4. Remove required KOs from box and attach conduit
fittings (not included) to box. Attach conduit to fittings.
WIDTH LENGTH BOX HEIGHT
5 15/16" [151mm] 7 1/4" [184mm] 4" [101.6mm]
Mudcap
7 3/8" [187mm]
9 15/32"
[241mm]
Mudcap
6 11/16"
[170mm]
7 7/8"
[200mm]
CAUTION: Not designed for use on bare
concrete or terrazzo floors
BOX DIMENSIONS
Page view 0
1 2 3 4

Summary of Contents

Page 1 - Evolution Series

Evolution Series Furniture Feed Floor BoxI N S T A L L A T I O N I N S T R U C T I O N SInstallation Instruction No.: 1 009 727R1 – Updated Octobe

Page 2

5. Level box as required and anchor box to decking. Tolevel, use 3/8-16 threaded rod (not included) cut tolength as needed and secured with hex nuts (

Page 3 - BOX DIMENSIONS

1. Position box in accordance with job site floor plan and/orengineering blue print. Use the dimensions give in thefollowing table as a reference for

Page 4

WIREMOLDU.S. and International: 60 Woodlawn Street • West Hartford, CT 061101-800-621-0049 • FAX 860-232-2062 • Outside U.S.: 860-233-6251 Canad

Related models: EFBFF-OG

Comments to this Manuals

No comments