Legrand K/KP deQuorum Worksurface Flip-Up Portal User Manual

Browse online or download User Manual for Hardware Legrand K/KP deQuorum Worksurface Flip-Up Portal. Legrand K/KP deQuorum Worksurface Flip-Up Portal User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
deQuorum
Work Surface Flip-Up Portal – KP Series
INSTALLATION INSTRUCTIONS
Installation Instruction No.: 42671R2 – Updated April 2005
Wiremold Electrical Systems conform to and should be installed
and properly grounded in compliance with requirements of the
current National Electrical Code, Canadian Electrical Code or
codes administered by local authorities.
All electrical products may represent possible shock or fire hazard
if improperly installed or used. Wiremold electrical products are UL
Listed to U.S. and Canadian safety standards, made for interior
use only, and should be installed in conformance with current local
and/or the National Electrical Code.
COMMUNICATIONS INSTALLATION
FOR USE IN DRY LOCATIONS ONLY! NOT FOR USE IN FLOORS
The provided receptacle is dust and splash resistant only. If liquid enters the unit, promptly disconnect breaker or unplug power
and allow to dry thoroughly.
The communication compartment
has two grommeted openings. One
communication cable can be
passed through each grommet.
© Copyright 2005 The Wiremold Company All Rights Reserved
With template provided, use an electric drill with
1/2" [12.7mm] bit to drill corner pilot holes.
Use a portable jigsaw to cut along the inside edge of the
template line. Test fit the enclosure to the hole cut. Carefully
file opening with wood rasp if required.
From under the table surface, attach
mounting brackets into corresponding
slots in the enclosure body for each
side. Tighten captive fastener until it
comes in contact with underside of
table. Tighten until snug. Do not over-
tighten.
Make final terminations. Plug cord into
a proper electrical receptacle. GFCI
protected circuits are recommended
HOLECUT INSTALLATION
1
3
4
2
Connect any electrical feed
and communications and drop
enclosure into opening
Wiremold / Legrand
U.S. and International:
60 Woodlawn Street • West Hartford, CT 06110
1-800-621-0049 • FAX 860-232-2062 • Outside U.S. 860-233-6251
Canada:
570 Applewood Crescent • Vaughan, Ontario L4K 4B4
1-800-723-5175 • FAX 905-738-9721
42671R2 – Updated April 2005 – For latest specs visit www.wiremold.com
CORD-ENDED
FIELD-INSTALLED
Page view 0
1 2

Summary of Contents

Page 1 - INSTALLATION INSTRUCTIONS

deQuorum™ Work Surface Flip-Up Portal – KP SeriesINSTALLATION INSTRUCTIONSInstallation Instruction No.: 42671R2 – Updated April 2005Wiremold Electri

Page 2 - DO NOT COPY OR SCALE!

For additional dimensional information and installation templates – please visit the CAD file section atwww.wiremold.comCAUTION: When printing copies

Comments to this Manuals

No comments