Legrand ECB User Manual

Browse online or download User Manual for Hardware Legrand ECB. Legrand ECB User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Wiremold
®
Evolution
Series A/V Ceiling Box
Boîtier AV de plafond série Evolution
Caja de A/V para cielorrasos serie Evolution
ECB2S, ECB2SP, ECB2S-CR, ECB2SP-CR,
ECB2S-RLNK, ECB2SP-RLNK
Country of Origin – Boxes: Made in USA • Fabriqué en USA • Hecho en USA
Country of Origin – Covers: Made in Mexico • Fabriqué en Mexico • Hecho en Mexico

Please read all instructions before
beginning installation
Legrand electrical systems conform to and
should be properly grounded in compliance with
requirements of the current National Electrical
Code or codes administered by local authorities.
All electrical products may present a possible
shock or re hazard if improperly installed or used.
Legrand electrical products may bear the mark of
a Nationally Recognized Testing Laboratory and
should be installed in conformance with current
local and/or the National Electrical Code.

VEUILLEZ LIRE L'ENSEMBLE
DES INSTRUCTIONS AVANT DE
COMMENCER L'INSTALLATION.
Les systèmes électriques Legrand sont
conformes au Code National de l'électricité
(National Electrical Code) ou aux codes
locaux en vigueur et doivent être mis à la terre
conformément à ces codes.
Tous les produits électriques peuvent présenter
un risque d'électrocution ou d'incendie s'ils ne
sont pas installés ou utilisés correctement. Les
produits électriques Legrand peuvent porter la
marque d'un laboratoire reconnu et doivent être
installés conformément au Code national de
l'électricité et/ou aux codes locaux en vigueur.

Lea todas las instrucciones antes
de comenzar la instalación.
Los sistemas eléctricos Legrand cumplen con los
requisitos del Código Eléctrico Nacional (National
Electrical Code, NEC) actual o con los códigos
impuestos por las autoridades locales y deben
conectarse a tierra consecuentemente.
Todos los productos eléctricos pueden presentar
un riesgo de descarga o incendio si se los instala o
utiliza incorrectamente. Los productos eléctricos
Legrand pueden llevar la marca de un laboratorio
de pruebas reconocido a nivel nacional y se deben
instalar conforme al código local en vigencia o al
Código Eléctrico Nacional.
No: 1012450 – 02/14 Installation Instructions • Notice d’Installation• Instrucciones de Instalación
Page view 0
1 2 3 4 5 6 ... 19 20

Summary of Contents

Page 1

Wiremold® Evolution™ Series A/V Ceiling BoxBoîtier AV de plafond série Evolution™Caja de A/V para cielorrasos serie Evolution™

Page 2

10Connect the equipment to the power module and the AV and Communication cables.Raccordez l'équipement au module d'alimentation ainsi qu&a

Page 3

11Controlled Receptacle Module Setup Guide for ECB2S-CR & ECB2SP-CRThe unit is controlled by a customer provided dry cont

Page 4

12Guide de configuration du module réceptacle pour ECB2S-CR & ECB2SP-CRL'unité est commandée par un contact sec f

Page 5

13La unidad se control

Page 6

14Racklink Module Setup Guide for ECB2S-RLNK & ECB2SP-RLNKConnect the device to your network using a standard Cat-5 or better cabl

Page 7

15Guide de configuration du module RackLink pour ECB2S-RLNK & ECB2SP-RLNKConnectez l'appareil à votre réseau à l'aide d&a

Page 8

Conecte el dispositivo a la red con un cable

Page 9

Press the Restore Defaults button on the device. This will default the login

Page 11



Page 12

2A. EnclosureB. Power ModuleC. Door FrameD. ShelfE. 2RU Support BracketsF. Projector Mount Cover Frame (included with ECB2SP M

Page 13

No: 1012450 0214© Copyright 2014 Legrand All Rights Reserved.© Copyright 2014 Tous droits réservés Legrand.© Copyright 2014 Legrand Todos los derecho

Page 14

31Determine the location to install the ceiling box and remove the ceiling tile.Déterminez l'emplacement pour l'installation du boîtier de p

Page 15

43Feed power using conduit: Remove one of the KO plates that feed the power module. Remove the appropriate twistout. Connect the conduit and wiring.

Page 16

55Remove cover from safety strap.Retirez le cache de la sangle de sécurité.Quite la cubierta de la correa de seguridad. 

Page 17

Place the ller material into the door frame and bend the holding tabs to secure the ller material into the frame.Placez le matériau de garniture d

Page 18

10Cut the ller material for the projector mount cover frame. Ceiling tile or drywall can be used as ller material. Measure distance from both sides

Page 19

813Install projector mount and projector. Thread projector mount extension (not supplied) into the projector mounting bracket in the ceiling box. The

Page 20 - No: 1012450 0214

15Reinstall the shelf into the ceiling box. The shelves can be hinged to have easy access to the front (Fig 1) or back (Fig 2) of the equipment by r

Comments to this Manuals

No comments